Project
Mechanical installations of an office buildingSlovenia · 2025
- Location
- Slovenia
- Year
- 2025
- Type of work
- Heating, cooling and hot water, Piping and process systems
Sample presentation — confirm the data with the client before publishing

Scope of work
Fabrication and installation of stainless steel piping with press-fitting joints, fabrication of substructures and supports, connection to the equipment. [CONFIRM EXACT SCOPE]
Challenge
Routing through a services floor crowded with other contractors' installations, with the requirement of a tidy, service-accessible layout.
Solution
The route was coordinated with the other installations before assembly, the supports were custom-made, and the visible details executed with particular attention to tidiness.
Result
The installation is ready for equipment connection, with a clear route and a clean handover to the next project phase.
Planning a similar project?
Send us a description and the technical documentation — we will propose a form of cooperation and a schedule.